China National Offshore Oil Corporation (CNOOC) has been in full swing in promoting development of the Bozhong 19-6 condensate gas field in central area of the Bohai Sea since the beginning of 2024.
A view of the Bozhong 19-6 condensate gas field [Photo/sasac.gov.cn]
Focusing on improving reservoir scheme design, well drilling engineering and ground-based supporting work, the company overcame well development under complicated geological conditions such as deep burial of the gas field, uneven reservoir distribution, poor permeability, and small overburden pressure differences, optimizing and adjusting well location.
A view of the Bozhong 19-6 condensate gas field [Photo/sasac.gov.cn]
So far this year, 7 development wells have been put into operation, with an additional daily production of condensate oil exceeding 1,100 metric tons and daily natural gas production exceeding 1 million cubic meters.
Four development wells have a daily production of oil and gas equivalent to over 400 tons.
A worker operates the facility at the Bozhong 19-6 condensate gas field. [Photo/sasac.gov.cn]
A worker operates the valve at the Bozhong 19-6 condensate gas field. [Photo/sasac.gov.cn]
A worker inspects and maintains the electrical equipment at the Bozhong 19-6 condensate gas field, ensuring safe and reliable operation of the facility. [Photo/sasac.gov.cn]
(Executive editor: Zhu Zeya)