Home> SOEs>Gallery

China Succeeds in Applying Master Control System to Offshore Wind Generator

Updated: June 10, 2021

The first "Huadian Ruifeng" 6.2-megawatt master control system was used on a wind generator at the offshore wind project at Haitan Strait in Fuqing, East China's Fujian Province on May 29.

It was the first time a China-developed wind power master control system was applied in an offshore wind generator.

Based on domestically-made CPU and programming software, the application signals that China has mastered key technologies of independent design, simulation testing and engineering application of such systems.

18874034_副本.jpg

Technicians debug the network of China's first wind generator master control system in the central control room of Huadian's offshore wind project at Haitan Strait in Fuqing, East China's Fujian Province, on May 28. [Photo/Xinhua]

18874035_副本.jpg

Workers construct circuitry at Huadian's offshore wind project at Haitan Strait, in Fuqing, Fujian Province, China's first wind generator adopting a domestic offshore wind power master control system, on May 28. [Photo/Xinhua]

18874037_副本.jpg

A view of Huadian's offshore wind project at Haitan Strait, in Fuqing, Fujian Province, on May 28 [Photo/Xinhua]



(Executive editor: Wang Ruoting)