The 142 MW coal-fired power plant in Bali, Indonesia was invested by China Huadian Corporation in March 2015. It is the first power plant to adopt a circular closed coal yard in Indonesia to reduce dust pollution. The emission concentration of sulfur dioxide, nitrogen oxides and dust is far lower than the local environmental protection requirements. It is praised as a model of Chinese technology and Chinese capital "going out" to benefit local areas. The picture shows the Bali coal-fired power station.
Photo source:
China Huadian Corporation