中文 Contact Us
Home > In Depth

Environmentally-Friendly Power Generation Project in East Shenzhen Starts Operation

Updated: 2020-09-23

2_副本.jpg

A design image of the East Shenzhen environmental protection power generation project [Photo/sasac.gov.cn]

The East Shenzhen environmental protection power generation project went into operation on Dec 31, 2019.

The project was designed by East China Electric Power Design Institute Co., Ltd. and contracted by China Energy Engineering Group Northeast No. 1 Electric Power Construction Co., Ltd, both subsidiaries of China Energy Engineering Group.

With a total investment of about 4.5 billion yuan ($657.45 million), the project included construction of six household waste incineration lines that can handle 5,100 tons of waste daily.

It is now the household waste incineration power plant with the greatest waste treatment capacity in China.



(Executive editor: Wang Ruoting)

Copyright ©  State-owned Assets Supervision and Administration Commission of the State Council All rights reserved. Presented by China Daily