中文 Contact Us
Home > In Depth

Shenzhen Pumped Storage Power Station Goes into Operation

Updated: 2020-09-23

2_副本.jpg

A view of the Shenzhen pumped storage power station [Photo/sasac.gov.cn]

The last generator unit of the Shenzhen pumped storage power station went on-line on Sept 25, 2018, marking that the first large-scale pumped storage power station in an urban area on the Chinese mainland was fully operational.

Contracted by China Gezhouba Group Mechanical & Electrical Construction Co., Ltd., a subsidiary of China Energy Engineering Group Co., Ltd. (Energy China Group), the station is a major project of China's renewable energy development plan and plays a key role in the "west-to-east" power transmission project and the power grid network in Guangdong and Hong Kong.



(Executive editor: Wang Ruoting)

Copyright ©  State-owned Assets Supervision and Administration Commission of the State Council All rights reserved. Presented by China Daily